Managerial Accounting Basics
Use simple cost models, contribution margin, budgets and variances to support internal decisions. Learn the assumptions behind the numbers rather than treating a calculation as a prediction.
0/6 lessons complete · Best assessment: 0% · Project pending
01 · Internal decisions and useful informationOpen lesson

Managerial accounting helps people inside an organization plan, monitor and decide. Reports may focus on one product, team or process rather than the entire organization. Start with the decision being considered, then choose relevant information. A detailed report is not useful if it answers a different question from the one the manager needs to resolve.
A workshop deciding whether to add an evening shift needs expected extra sales, extra costs, capacity and staffing information.
Try it yourself
Describe an internal decision and list three numbers and one nonfinancial fact you would need.
02 · Fixed, variable and mixed costsOpen lessonLocked — complete previous lessons

A fixed cost stays approximately unchanged in total within a relevant range of activity. A variable cost changes with the activity measure. A mixed cost has both parts. These are model assumptions over a specified period and operating range; a cost can behave differently when capacity changes or contracts are renewed.
In a simplified workshop, rent is $1,200 monthly and materials are $8 per item. Making 100 items gives $800 of material cost; 200 gives $1,600.
Try it yourself
Classify monthly rent, per-item packaging and a utility bill with a base charge plus usage.
03 · Contribution marginOpen lessonLocked — complete previous lessons

Contribution margin equals sales less variable costs. Per unit, subtract variable cost per unit from selling price. This amount first covers fixed costs; only after fixed costs are covered does the simplified model show operating profit. Contribution margin is not the same as cash in the bank or gross profit calculated under every financial-reporting format.
Price $30 less variable cost $12 gives $18 contribution per unit. For 100 units, total contribution is $1,800 before fixed costs.
Try it yourself
Calculate contribution for a $25 item with $9 variable cost: $16 per unit.
04 · Break-even and margin of safetyOpen lessonLocked — complete previous lessons

For a single-product model, break-even units equal fixed costs divided by positive contribution margin per unit. Round up when whole units are required. The model assumes the stated price and variable cost remain stable and that the units can be sold. Margin of safety compares planned or actual sales with break-even sales; it does not guarantee protection from every business risk.
Fixed cost $900 and contribution $15 per unit: break-even is 60 units. Planned sales of 80 units give a 20-unit margin of safety.
Try it yourself
Use the Cost Model Lab to test how a higher variable cost changes break-even.
05 · Budgets and variancesOpen lessonLocked — complete previous lessons

A budget records assumptions and planned amounts. A variance compares actual results with the plan; always state your sign convention. A flexible budget adjusts variable costs for actual activity, making it easier to distinguish a spending difference from a volume difference. A favorable cost variance can still reflect an undesirable choice, such as postponing necessary maintenance.
A cost budget at actual output allows $600; actual spending is $660. Using actual minus budget gives +$60, unfavorable for cost.
Try it yourself
Calculate actual $540 minus budget $600: −$60, favorable for cost under this convention.
06 · Relevant costs and balanced decisionsOpen lessonLocked — complete previous lessons

Relevant costs differ between the alternatives being considered. A past cost that cannot be recovered is sunk and does not change because of the new decision. Opportunity cost represents a benefit given up by choosing one option. Consider quality, staff, safety and customers alongside the numbers, and make uncertainty explicit.
A machine purchased last year cannot be returned. Its historical price is not the incremental cost of today’s decision, though future maintenance and alternative use may matter.
Try it yourself
Complete your workshop project and list two assumptions that could fail.